Skip to content

Construction Operations

Construction Data ModelingComplex Files & MediaAI ClassificationMessaging & ChannelsThird-Party SaaS & ERPApprovals & Governance
Construction Operations template preview

Construction Operations is an end-to-end contractor project management workspace designed for both main contractors coordinating multi-trade subcontractors and specialist subcontractors delivering their own packages. It unifies field communication from WhatsApp and Email, 3D BIM models, hierarchical work-breakdown schedules, and a catalog-controlled commercial and cashflow ledger in one operational hub.

Construction teams typically lose hours every week reconciling scattered spreadsheets, buried site chats, outdated bill-of-quantities workbooks, and disconnected delivery dockets. This workspace replaces those manual handoffs with a single source of truth per project: one authoritative 3D BIM model paired with one live cost estimate, standardized rate catalogs across every order and invoice, three-way verification across commitments, deliveries, and billing, and structured capture of site updates as they happen.

Expected Business Impact

  • Eliminate pricing drift and commercial leakage: Every line item on client contracts, subcontracts, Variation Orders, Purchase Orders, Delivery Orders, Invoices, and Ad-hoc Costs draws from project BIM takeoff quantities or the approved Item Matrix — removing free-text line entries and keeping estimated budgets, commitments, deliveries, and payouts reconciled item by item.
  • Cut manual BIM takeoff turnaround: Automated deduplication and visual AI classification group thousands of repeated model elements into unique component types, price them against active unit rates and waste factors, remember what each component is priced as across takeoffs and projects (a Quantity Surveyor's correction wins from then on), and propose Item Matrix entries for unrecognized assemblies for Quantity Surveyor approval rather than full manual re-measurement.
  • Prevent stale estimates after design revisions: Replacing a project's BIM model keeps the prior file in record history, flags the model for re-costing, and marks the prior cost estimate void until the new model is taken off and priced.
  • Turn unstructured site chatter into actionable records: WhatsApp messages, voice notes, site photos, and email attachments are automatically transcribed, routed to the right project, and drafted into task updates and comments with the photos and documents filed under each task, site issues logged in their task's activity with the photos, draft variation orders, or commercial documents.
  • Enforce commercial discipline with clear audit trails: Executed contracts, issued invoices, certified progress claims, incurred ad-hoc costs, and baselined cost estimates lock automatically against silent edits, while automatic three-way matching flags billing variances before payment.

Roles & Access

Workspace authority is divided across four business teams to maintain separation between site delivery, commercial control, workspace administration, and external stakeholders:

  • Construction Administrators: Full operational, commercial, and setup authority across projects, schedules, BIM models, contracts, invoices, the Item Matrix, Business Partners, and shared company integrations (including Autodesk Construction Cloud).
  • Project Delivery (Project Managers & Site Supervisors): Manage project setup, BIM model revisions, filed drawings and specifications, work-breakdown schedules and their activity (comments, defects, RFIs and other site issues, and meetings), Business Partners, and message triage. Delivery users cannot create or alter commercial contracts, invoices, ad-hoc costs, or master unit rates; when they upload a revised BIM model, the workspace automatically marks the previous cost estimate void without granting access to commercial pricing.
  • Commercial & Quantity Surveying (QS): Manage client contracts, subcontracts and supply contracts with their value, retention, tax, and payment terms, Variation Orders, Purchase Orders, Delivery Orders, Invoices, Progress Claims, Ad-hoc Costs, the master Item Matrix (including approving the Item Matrix entries the AI proposes), what each BIM asset is priced as, and BIM cost estimation review and baselining. Commercial users can comment on tasks but cannot raise issues, log meetings, or modify site schedules or BIM models.
  • Client & Consultant: Read-only visibility across the Operations app to inspect project status, programmes, 3D models, site issues, and commercial progress — with zero write permissions and no visibility into internal integrations or configuration settings.

Personal WhatsApp and email channels are strictly isolated per team member: individuals can connect and configure intake rules only for their own accounts, while company-wide shared channels are administered centrally.

Apps & Functionality

Operations

App / Module Functionality
Projects Portfolio register showing project role (Main Contractor, Subcontractor, or Specialist Contractor), client, status, schedule, open tasks, open issues, and active contracts, plus a Messages to file tab, shown only while messages no project could be found for wait to be filed. Opening any project enters the seven-tab Project Hub detailed below.
Project Hub — Record The project's own fields: name, number, role, status, client (the partner who engaged us — the client, or the main contractor when we subcontract), project manager, schedule, reporting currency, Autodesk project link, and description, plus the site address and spatial zones and grid axes.
Project Hub — Programme & Tasks Work-breakdown schedule and milestone tracking, nested by breakdown code (3.1.2 sits under 3.1, under 3) with each task keyed by its source-schedule activity ID. A BIM task builds model elements; an ad hoc task is work the model does not show (scaffolding, cranage, concrete testing, collecting documents). Quick switching between a Timeline (interactive 4D date scrubber, summary rollups, milestone diamonds, behind-plan alerts, and one-click isolation of the scheduled elements in the 3D BIM viewer), Table (with kind and open-issue columns), and streamlined Board view (open-issue badges on cards). A task opens in three tabs: Record holds its title, a description edited as it reads (pictures pasted, dropped, or added are stored among its documents and shown in place), and its latest update, beside its properties and WBS & 4D BIM links; Activity is one timeline, oldest first, of what happens on the task — comments, issues (an incident on site with its type, severity, and open or closed status, closed or reopened in place), and meetings (attendees and minutes) — each with its author or, when filed from a message, the sender and channel, and posted files as thumbnails; it filters to All, Comments, Issues, or Meetings, Raise issue and Log meeting open the activity form, an issue or meeting opens its record, and the comment box at the bottom takes pictures; Documents holds its photos and files, including pictures pasted into the description and files filed from WhatsApp or email. Supports two-way Autodesk Construction Cloud schedule sync plus Primavera P6, Microsoft Project, Excel, and CSV import/export.
Project Hub — BIM Four sub-tabs: 3D Model & Tasks pairs an interactive browser 3D viewer (fast local caching after first open, Orbit/Pan/Inspect navigation, keyboard controls, Iso/Top/Front/Side camera presets, X/Y/Z 3D section cuts, and the elements of BIM tasks with open issues highlighted) with the project's BIM tasks — selecting a task isolates its elements in the brand colour with the rest of the model translucent and frames them, selecting it again or Show whole model restores the full model, and a row action opens the task; picking an element lists the BIM tasks that build it with their open issues and offers New BIM task for it; BIM Costing is one card showing the project's single BIM cost estimate with its status in place (no model, kept as reviewed or baselined until set back to draft, needs takeoff, pricing, failed with the reason, or priced at a time), one Run BIM takeoff & costing button, coverage, totals and takeoff lines, and the estimate record opened for review and baselining; Assets lists each unique asset the estimate priced and what it is priced as, where a Quantity Surveyor corrects it; Model file holds the revision label, the single IFC model, and its parsed summary.
Project Hub — Finance Five sub-tabs: Overview shows the Cashflow & Commercial Pulse (each figure tagged In, Out or Net: client contract value in, commitments to subcontractors out, projected cashflow and margin net, plus overall physical progress, overdue alerts, and a monthly chart of money in from the client against money out to subcontractors); Cashflow & Budget reconciles every BIM and catalog code with each column marked by side — In: client contract value; Out: cost budget, commitments to subcontractors, Delivered (DO), billed, paid, and budget left; Net: in less committed out; Client contracts and Subcontracts & supply manage upstream and downstream agreements, each carrying its value, retention, tax, and payment terms, with nested Variation Orders (VO), nested Transactions (Purchase Orders, Delivery Orders, Invoices, Progress Claims, Credit Notes), automatic three-way PO → DO → Invoice matching, execution locks, and one-click progress claim drafting; Ad-hoc Costs tracks catalog-backed non-BIM project costs (preliminaries, hoisting and logistics, permits, testing and commissioning, temporary works, and site overheads).
Project Hub — Sustainability Overview totals the project's embodied carbon (kgCO₂e or tCO₂e) from the building model's priced quantities and from ad-hoc costs, each multiplied by its Item Matrix carbon factor, charts it by discipline, and counts the lines with no carbon factor; Carbon by item lists every item's quantity, factor and carbon, largest first.
Project Hub — Documents Filed documents register: drawings, specifications, schedules, contract documents, handover records, and synced Autodesk sheets, with earlier versions kept in record history.
Project Hub — Site updates The WhatsApp and email messages filed to the project, each with what it was used for and its extraction status, with Route again and Extract again actions on selected messages.
Business Partners Dedicated partner register organized into All Partners, Customers, Vendors, and Subcontractors across 16 construction trade specialties, with contact handles for automatic message matching, standard payment terms, and per-partner tabs for linked Orders & Contracts, Transactions, and Assigned Tasks.

Configuration

App / Module Functionality
Item Matrix Master catalog of active unit rates, embodied carbon factors (kgCO₂e per unit), measurement bases (count, length, area, volume, weight, lump sum, percentage, or derived from another item's priced quantity for what the model does not carry, such as unmodelled rebar, formwork, or paint), waste factors, rate bases, currencies, validity periods, and trade classifications covering both BIM assets and approved Ad-hoc Cost catalog items, with bulk Excel and CSV import/export.
Connections Isolated workspace to pair personal WhatsApp and email accounts, define personal message filtering and AI auto-extraction guidelines, and manage administrator-owned shared company channels and Autodesk Construction Cloud links.

Automations & Connections

Built-In Automations

  • Visual AI BIM Takeoff & Costing: Takes the IFC model off in the browser that uploads it, collapses repeated elements into unique assets (an assembly such as a stair counts once, as a whole), measures each from its geometry, and pictures each alone from four angles; prices each asset as remembered from earlier takeoffs and Quantity Surveyor corrections, classifies only the rest against active currency-matched Item Matrix items, prices quantities with waste factors and contingency, and totals the estimate's embodied carbon from each item's carbon factor. Assets nothing in the Item Matrix covers get AI-proposed Item Matrix entries that wait for commercial approval before they price anything.
  • Continuous WhatsApp & Email Intake + Voice Transcription: Mirrors incoming and outgoing messages from connected accounts as they arrive, respects each connection's chosen start window, carries through attachments and photos, and transcribes site voice notes into searchable text.
  • Automated Project Routing & Structured Extraction: Routes incoming messages to the right project using contact handles, project codes, each partner's live contracts and client projects, and AI classification (automatically re-evaluating unassigned threads whenever contacts or intake rules change), then extracts one update and one comment for each task a message concerns (filing the message's photos and documents under the task, and changing status, progress, priority, zone, trade, or due date only when the message says so), site issues logged as issue activities of their task with the message's photos (an incident no task covers opens an ad hoc task of its own), draft variation orders, and draft commercial documents from messages and attached PDFs or images.
  • One-Click Progress Claim Valuation: Computes gross work done from revised contract values and physical schedule progress, applies the client contract's retention rate and cap, deducts previously certified or submitted inflows, and drafts a ready-to-review Progress Claim (a project without an active client contract cannot claim).

External Connections & File Formats

  • WhatsApp & Email: Personal member connections and shared company accounts for continuous field intake.
  • Autodesk Construction Cloud (ACC): Secure account authorization providing two-way schedule synchronization (every 30 minutes) and project sheet/document synchronization (hourly).
  • Industry File Standards: Native import and export support for IFC 3D BIM models, Primavera P6 schedules, Microsoft Project schedules, Excel, CSV, and PDF document conversion.

Scope & Boundaries

  • Operational project control, not statutory accounting: The workspace manages project budgets, orders, variations, deliveries, billing, claims, and cashflow forecasting, and provides clean data for finance teams — it does not replace an enterprise general ledger, execute bank or GIRO transfers, or submit statutory tax filings.
  • BIM coordination and takeoff, not CAD authoring: Users inspect, slice, plan BIM tasks on, and estimate federated IFC models exported from authoring tools such as Revit, ArchiCAD, or Tekla — geometry authoring, clash resolution modeling, and professional engineering sign-off remain in specialist CAD tools.
  • Drafting assistance with human sign-off: AI-extracted variation orders, invoices, progress claims, and BIM cost estimates always enter in draft status and require authorized Quantity Surveyor or Project Manager review before activation, issuance, or baselining; AI-proposed Item Matrix entries price nothing until commercial approves them.
  • Customer-managed external accounts: Organizations provision and maintain their own Autodesk Construction Cloud credentials, WhatsApp accounts, email accounts, and company rate cards.

Documentation